Blog

Parking Lot Paved

Nov 02, 16

Less Mud! 

Marks Lumber has paved the main part of our yard, over 55,000 square feet. This smoother and less dusty surface will make it easier to serve our customers. Thanks to all our customers for being patient throughout this project, and we look forward to helping you with your siding, circle sawn flooring, timber, or other lumber and landscape needs.

Our yard guys are looking forward to spending a lot less time wiping there feet before coming in the office!

Less Dust!

The Debarker in the sawmill still makes a lot of dust, but the blacktop will really help keep the dust down from all the traffic right around the office.



Other Posts

16
Aug

Marks Lumber's Process for Drying and Grading Lumber

Drying Montana Lumber  After the cutting process, lumber products are ready to be dried and the yard/planer team at Marks Lumber takes over. This is ...

~ View Now ~
11
Aug

Sawing Specialty Lumber Products

This is the second in the continuing series on how Montana Logs are harvested and then top-quality wood products manufactured. In the previous post, “...

~ View Now ~
01
Aug

Do You Know Where Your Wood Flooring Comes From?

Making a purchase or consuming products that are grown and manufactured locally minimizes ecological impact and maximizes benefit to your local commun...

~ View Now ~